Vaisigano Bridge Reconstruction Project

The bridge was completed in 2020 by using the pre-tensioned girder construction method. Generally, pre-tensioned girder is pre-manufactured in our specialized manufacturing facilities. However due to the geographical condition and the availability circumstances, the concrete abutment was simplified and manufactured in a makeshift factory locally and pre-tensioned simultaneously in batches to match the same quality as those manufactured in our specialized factory.

Project Site Apia City, Independent State of Samoa
Completion Year 2020
Client Independent State of Samoa
Specifications Bridge Length: 75m
Span Length: 3x25m
Width: 13m
Girder Height: 1.1m
Other: Salt Damage Protection
Construction Method Pre-tensioned Hollow Girder Bridge