Top of the page
Start of header
  • Japanese
  • News
  • Sitemap
  • Font Size [S]
  • Font Size [M]
  • Font Size [L]


Start of main content

Works:Architecture

  • Back to list
  • Contact Us

Wellith Garden Chiba Minato Park

OwnerNTT Urban Development Co. and Mitsubishi Estate
DesignP.S. Mitsubishi Construction Co., Ltd.
ArchitecturePCaPC, quake-absorbing structure
Completion2006
Gross Floor Area13,991m2
Scale19 stories above the ground
LocationChiba City, Chiba Prefecture

"Quake-absorbing method-of-structure + PCaPC method" was adopted, and safety, durability, and comfort were realized. Moreover, concrete with small unit water content provides excellent chloride-attack-proof and neutralization-proof performance. The strong and reliable technology keeps asset value high for a long time. Furthermore, the skeleton infill which increases the size of a dwelling unit and flexibility to future alteration of room arrangement, also can respond to change of a future housing situation.

  • Summary
  • Feature

Other

End of main content


  • Privacy Policy
  • About this Site