National Highway Network Interconnecting Bridges Construction Project (Package 01)

The bridges package was completed back in 2017. Out of 10 Bridges due for replacement, 4 bridges was scheduled to be constructed with post-tensioning method. 110 unit of post-tensioned girders were manufactured and the project consisting of 22 span was constructed and assembled by using a portal crane.

Project Site Southern Province of the Democratic Republic of Sri Lanka
Completion Year 2017
Client Democratic Republic of Sri Lanka
Specifications B01: Bridge Length 165m (5x33m) Width 21.2m
B03: Bridge Length 60m (2x30m) Width 21.2m
B04: Bridge Length 70m (2x35m) Width 21.2m
B05: Bridge Length 120m (4x30m) Width 10.4m
Girder Height: 1.7m-1.9m
Construction Method Post-Tensioned Girder Component Bridge

Other