Bridges

Hadase Bridge Construction Project
- Interconnecting Highway Bridge (Phase 3)

The bridge was completed in 2008 and was built as part of the connecting bridge for the northwest highway passing through the Blue Nile River. The northwest highway is one of the 5 national highway connecting the surrounding area to the capital of Ethiopia, Addis Ababa. The total length of the bridge is 303m consisting of 3 spans. On this particular project, we are involved on the superstructure construction.

Project Site Federal Democratic Republic of Ethiopia
Completion Year 2008
Client Federal Democratic Republic of Ethiopia
Specifications Bridge Length: 303m
Span Length: 18m/70m/145m/70m
Width: 9m
Girder Height: 5.5m-3m
Construction Method Extradosed Construction

Other